Allow 4 to 5 weeks for completion
Allow 4 to 6 weeks for completion
Allow 4 to 6 weeks for completion
From -1.00 to -6.00 back side correction on super modular HD Myo-Lenticular.
Available segments range from 8 -28 mm. Addition from 1.00 - 6.00D
Allow 4 to 6 weeks for completion
Prism up to 6D on reading portion, combined with blended Round Seg up to +6.00 add power.
Frame restrictions may apply
4 to 6 weeks turnaround time
Myo-Disc up to -27D Standard and Double Myo with Polish Facet
Pic. Specs.
-24D. power with 48 mm opening field. 1.67 material
*Max power -27D on extra thick blank 1.74
4 to 6 weeks turn-around time
Max to-24D on extra-thick blank -1.74 2Bc material
3 to 5 weeks turn-around time
Cyl. up to -18D keratoconus patients who may not be suitable candidates for contact lenses
Correction for patients off contact lenses with Polish Facet
Pic Specs: -3.00 +14.00 x 110
Maximum CYL. power up to 16D on cr39 -1.6 - 1.67 and 1.74 material
Not available in poly, Trivex and Transitions
4 to 6 weeks turn-around time
Rd. Seg. size available upon request from 8mm to 40 mm. Ultex design (larger than 28 will be blended as Semi Round Design)
Executive line manufactured by single point blade 1mm. Straight line blended on back side throughout the lens
4 to 6 weeks turn-around time
HD progressive short corridor will manufacture on semi blended Flat-Top or Tri-focal 28 mm. or 35 mm. Also available as traditional vocational Double-D with 60/100 or 100/100
4 to 6 weeks turn-around time
Copyright © 2024 SouthView Optical - All Rights Reserved.
Powered by GoDaddy